Marnell Air Cargo Center
Project Briefing
Both buildings are encompassed by flexible and rigid pavements along with designated trailer landing pads for loading and unloading; aircraft tether tie downs; retaining walls to maintain grade variations, and extensive landscaping.
200,928
Both buildings are 30 feet tall, tilt-up concrete construction with steel joist and deck and TPO roofing. Each building has multiple loading docks, some with levelers, and some at grade level, each with overhead door access.