
Fontanesi Cold Storage

Project Briefing
185,795
The large commercial tilt-up concrete construction boasts numerous details of interest. These include, but are not limited to:
-
625,000 feet of wiring.
57,000 SF of cooler/freezer space.
7,500 SF standalone maintenance facility.
25,000 Gallon fuel center.
37,000 SF of insulated concrete sandwich panels.
14,000 CY of total concrete.
133,000 SF of interior and exterior insulated metal panels.



Follow
Us On Social

